Skip to content

21 CFR 820.80: Receiving, in-process, and finished device acceptance

FDA's inspection data lists 2,540 Form 483 citations of 21 CFR 820.80 at 1,903 facilities, from October 2008 to January 12, 2026. 37 warning letters state a violation of it. eCFR shows this section removed on February 4, 2026.

Counts: FDA Data Dashboard citations, last synced Nov 23, 2026, 04:25 UTC, and FDA's warning letters, last synced Nov 23, 2026, 04:17 UTC. Regulation text: eCFR. FDAgent is independent of FDA.

Form 483 citations
2,540
At 2,305 inspections
Facilities cited
1,903
Distinct FEIs
Most recent citation
Jan 12, 2026
Innova Vascular Inc
Warning letters
37
State a violation of it

The regulation

Removed from the CFR on 2026-02-04. The text shown is the last text in force before then (eCFR version of 2016-12-30).

§ 820.80 Receiving, in-process, and finished device acceptance.

(a) General. Each manufacturer shall establish and maintain procedures for acceptance activities. Acceptance activities include inspections, tests, or other verification activities.

(b) Receiving acceptance activities. Each manufacturer shall establish and maintain procedures for acceptance of incoming product. Incoming product shall be inspected, tested, or otherwise verified as conforming to specified requirements. Acceptance or rejection shall be documented.

(c) In-process acceptance activities. Each manufacturer shall establish and maintain acceptance procedures, where appropriate, to ensure that specified requirements for in-process product are met. Such procedures shall ensure that in-process product is controlled until the required inspection and tests or other verification activities have been completed, or necessary approvals are received, and are documented.

(d) Final acceptance activities. Each manufacturer shall establish and maintain procedures for finished device acceptance to ensure that each production run, lot, or batch of finished devices meets acceptance criteria. Finished devices shall be held in quarantine or otherwise adequately controlled until released. Finished devices shall not be released for distribution until:

(1) The activities required in the DMR are completed;

(2) the associated data and documentation is reviewed;

(3) the release is authorized by the signature of a designated individual(s); and

(4) the authorization is dated.

(e) Acceptance records. Each manufacturer shall document acceptance activities required by this part. These records shall include:

(1) The acceptance activities performed;

(2) the dates acceptance activities are performed;

(3) the results;

(4) the signature of the individual(s) conducting the acceptance activities; and

(5) where appropriate the equipment used. These records shall be part of the DHR.

21 CFR Part 820: Quality Management System Regulation, Subpart HRead on eCFR

Citations by year

Form 483 citations of 21 CFR 820.80 by the year the inspection ended. FDA's citation data starts with inspections ending in October 2008, and the current year runs to the latest sync, so both are partial years (lighter bars).

Peak: 232 in 2012

Form 483 citations of 21 CFR 820.80 by inspection year
YearForm 483 citations
200820
2009169
2010186
2011218
2012232
2013213
2014188
2015186
2016145
2017182
2018151
2019159
202041
202164
202280
2023101
2024102
2025101
20262

How FDA words this citation

FDA's short descriptions and citation text on these 2,540 citations, most used first. These are FDA's standard summaries in its citation data, not the text of any one Form 483.

Short descriptions

  • Lack of or inadequate final acceptance procedures666 citations
  • Lack of or inadequate procedures - Acceptance activities559 citations
  • Lack of or inadequate receiving acceptance procedures536 citations
  • Documentation432 citations
  • Lack of or inadequate In-process acceptance procedures183 citations
Show 3 more
  • Incoming acceptance records, documentation108 citations
  • Incoming inspection, testing, verification23 citations
  • No release signature9 citations

Citation text

  • “Procedures for finished device acceptance have not been adequately established.”455 citations
  • “Procedures for acceptance of incoming product have not been adequately established.”348 citations
  • “Procedures for acceptance activities have not been adequately established.”346 citations
  • “Procedures for acceptance activities have not been established.”167 citations
Show 2 more
  • “Procedures for finished device acceptance have not been established.”155 citations
  • “Procedures for acceptance of incoming product have not been established.”143 citations

Facilities cited most recently

The latest inspections where FDA cited 21 CFR 820.80, by inspection end date, with FDA's short description. Each links to the facility's FDA record on FDAgent.

Show 4 more
  • Specialty Health Products CO, LLC2025-12-11 · FEI 2027347Lack of or inadequate receiving acceptance procedures
  • Hatch Product Development LLC2025-12-11 · FEI 3030438338Lack of or inadequate final acceptance procedures
  • ASEPTIKITS, LLC2025-12-03 · FEI 3015422213Lack of or inadequate final acceptance procedures
  • Avokaid, LLC2025-11-25 · FEI 3026229484Lack of or inadequate procedures - Acceptance activities

What the observations say

Excerpts from Form 483s that FDA posted in its reading room. A Form 483 usually doesn't name the regulation, so FDAgent ties an observation to 21 CFR 820.80 only when it opens with one of FDA's standard citation texts for this section, word for word apart from case, spacing and punctuation. 3 observations tie this way. The highlighted sentence is the matched wording.

  • Foremount Enterprise Co., Ltd.2025-06-19 · Observation 6

    Procedures for acceptance activities have not been adequately established. Specifically, on June 18, 2025, during the inspection of production and process activities I identified multiple boxes Top Shelf, Par (b) (4) 2, components (approximately (b) (4) ), Lot# (b) (4) which per your firm's staff is used in the manufacturing of your Class II Non-Rebreathing Valves, Product Code CBP. However, per your material specifications CPR One-Way Value, …

    This observation opens with FDA's standard wording for 21 CFR 820.80(a).

  • Engage Uni LLC2021-11-12 · Observation 1

    Procedures for acceptance activities have not been adequately established. Specifically, Your firm's machining and finishing supplier for (b) (4), (b) (4), and (b) (4) failed to identify results of in-process inspection that deviated from the specifications documented on the inspection form, and these out of specification measurements were subsequently unidentified during DHR review conducted by your firm upon acceptance of finished devices. All …

    This observation opens with FDA's standard wording for 21 CFR 820.80(a).

  • Alphatec Spine, Inc.2015-03-13 · Observation 9

    Procedures for acceptance activities have not been adequately established. Specifically, Document/Procedure No.: QCP-042 - Supplied Material Inspection, Revision J is not adequately defined in that Section No.: 6.9.8.1 provides instructions, "(b) (4)." However, the instructions do not define where on the (b) (4) (i.e., beginning, middle, end, etc.) to take the measurements. For example, regarding the receipt of Part No.: (b) (4) Lot No.: (b) (4) …

    This observation opens with FDA's standard wording for 21 CFR 820.80(a).

Warning letters stating a violation of 21 CFR 820.80

37 warning letters FDA posted state a violation of this section in a numbered violation sentence. The most recent are below, each linking to FDAgent's page for the letter.

“Failure to establish and maintain procedures for acceptance of incoming product, as required by 21 CFR 820.80(b).”
“Failure to establish and maintain procedures for finished device acceptance to ensure that each production run, lot, or batch of finished devices meets acceptance criteria, as required by 21 CFR 820.80(d).”

Each letter below states the violation in these words.

“Failure to adequately establish procedures for finished device acceptance, as required by 21 CFR § 820.80(d).”
“Failure to adequately establish and maintain procedures for finished device acceptance to ensure that each production run, lot, or batch of finished devices meets acceptance criteria, as required by 21 CFR 820.80(d).”
“Failure to establish and maintain procedures for acceptance of incoming product. Incoming product shall be inspected, tested, or otherwise verified as conforming to specified requirements. Acceptance or rejection shall be documented, as required by 21 CFR 820.80(b).”

Often cited at the same inspection

Of the 2,305 inspections where FDA cited 21 CFR 820.80, the share where it also cited each of these sections.

Ask FDAgent about 21 CFR 820.80

FDAgent reads FDA's Form 483 citations, observations and warning letters and answers in plain English, with links to the records.

Edit it or ask as written. 3 questions free, no card needed.

About this data

  • Citation counts come from FDA's Data Dashboard, which lists the regulation behind each Form 483 observation for inspections since October 2008.
  • Observation excerpts come from Form 483 PDFs in FDA's electronic reading room, tied to this section only by exact wording as described above.
  • A warning letter counts for this section when one of its numbered violation sentences cites 21 CFR 820.80; FDAgent quotes that sentence exactly.
  • FDAgent rebuilds this page every week from FDA's public data and is independent of FDA.