21 CFR 820.72: Inspection, measuring, and test equipment
FDA's inspection data lists 1,103 Form 483 citations of 21 CFR 820.72 at 925 facilities, from October 2008 to December 11, 2025. 9 warning letters state a violation of it. eCFR shows this section removed on February 4, 2026.
Counts: FDA Data Dashboard citations, last synced Nov 23, 2026, 04:25 UTC, and FDA's warning letters, last synced Nov 23, 2026, 04:17 UTC. Regulation text: eCFR. FDAgent is independent of FDA.
- Form 483 citations
- 1,103
- At 1,070 inspections
- Facilities cited
- 925
- Distinct FEIs
- Most recent citation
- Dec 11, 2025
- Specialty Health Products CO, LLC
- Warning letters
- 9
- State a violation of it
The regulation
Removed from the CFR on 2026-02-04. The text shown is the last text in force before then (eCFR version of 2016-12-30).
§ 820.72 Inspection, measuring, and test equipment.
(a) Control of inspection, measuring, and test equipment. Each manufacturer shall ensure that all inspection, measuring, and test equipment, including mechanical, automated, or electronic inspection and test equipment, is suitable for its intended purposes and is capable of producing valid results. Each manufacturer shall establish and maintain procedures to ensure that equipment is routinely calibrated, inspected, checked, and maintained. The procedures shall include provisions for handling, preservation, and storage of equipment, so that its accuracy and fitness for use are maintained. These activities shall be documented.
(b) Calibration. Calibration procedures shall include specific directions and limits for accuracy and precision. When accuracy and precision limits are not met, there shall be provisions for remedial action to reestablish the limits and to evaluate whether there was any adverse effect on the device's quality. These activities shall be documented.
(1) Calibration standards. Calibration standards used for inspection, measuring, and test equipment shall be traceable to national or international standards. If national or international standards are not practical or available, the manufacturer shall use an independent reproducible standard. If no applicable standard exists, the manufacturer shall establish and maintain an in-house standard.
(2) Calibration records. The equipment identification, calibration dates, the individual performing each calibration, and the next calibration date shall be documented. These records shall be displayed on or near each piece of equipment or shall be readily available to the personnel using such equipment and to the individuals responsible for calibrating the equipment.
21 CFR Part 820: Quality Management System Regulation, Subpart GRead on eCFR
Citations by year
Form 483 citations of 21 CFR 820.72 by the year the inspection ended. FDA's citation data starts with inspections ending in October 2008, and the current year runs to the latest sync, so both are partial years (lighter bars).
Peak: 87 in 2017
| Year | Form 483 citations |
|---|---|
| 2008 | 20 |
| 2009 | 73 |
| 2010 | 78 |
| 2011 | 79 |
| 2012 | 75 |
| 2013 | 71 |
| 2014 | 77 |
| 2015 | 83 |
| 2016 | 64 |
| 2017 | 87 |
| 2018 | 79 |
| 2019 | 82 |
| 2020 | 20 |
| 2021 | 24 |
| 2022 | 50 |
| 2023 | 56 |
| 2024 | 44 |
| 2025 | 41 |
How FDA words this citation
FDA's short descriptions and citation text on these 1,103 citations, most used first. These are FDA's standard summaries in its citation data, not the text of any one Form 483.
Short descriptions
- Calibration, Inspection, etc. Procedures Lack of or Inadequ654 citations
- Equipment control activity documentation189 citations
- Calibration procedures - content70 citations
- Equipment suitability & capability70 citations
- Remedial action55 citations
Show 3 more
- Calibration documentation30 citations
- Remedial action - documentation29 citations
- Calibration standard traceability6 citations
Citation text
- “Procedures to ensure equipment is routinely calibrated have not been adequately established.”217 citations
- “Procedures to ensure equipment is routinely calibrated, inspected, checked and maintained have not been adequately established.”92 citations
- “Equipment calibrations have not been documented.”80 citations
- “Procedures to ensure equipment is routinely calibrated have not been established.”59 citations
Show 2 more
- “Procedures to ensure equipment is routinely calibrated, inspected, checked and maintained have not been established.”43 citations
- “Calibration procedures do not include specific directions and limits for accuracy and precision.”40 citations
Facilities cited most recently
The latest inspections where FDA cited 21 CFR 820.72, by inspection end date, with FDA's short description. Each links to the facility's FDA record on FDAgent.
- Specialty Health Products CO, LLC2025-12-11 · FEI 2027347Calibration, Inspection, etc. Procedures Lack of or Inadequ
- Digirad Diagnostic Imaging, LLC2025-11-25 · FEI 3001236767Calibration, Inspection, etc. Procedures Lack of or Inadequ
- Creative Foam Corporation - Bremen2025-11-24 · FEI 3001814065Calibration, Inspection, etc. Procedures Lack of or Inadequ
- Akervall Technologies, Inc.2025-11-06 · FEI 3011547262Calibration, Inspection, etc. Procedures Lack of or Inadequ
Show 4 more
- Drake Precision Dental Laboratory2025-11-05 · FEI 3002706372Equipment control activity documentation
Warning letters stating a violation of 21 CFR 820.72
9 warning letters FDA posted state a violation of this section in a numbered violation sentence. The most recent are below, each linking to FDAgent's page for the letter.
“Failure to ensure that all inspection, measuring, and test equipment, including mechanical, automated, or electronic inspection and test equipment, is suitable for its intended purposes and is capable of producing valid results, as required by 21 CFR 820.72(a).”
Each letter below states the violation in these words.
- The Richline Group, Inc.Issued 2025-08-25
- Wissner-Bosserhoff GmbHIssued 2024-08-30
“Failure to establish and maintain procedures to ensure that equipment is routinely calibrated, inspected, checked, and maintained. These activities shall be documented, as required by 21 CFR 820.72(a).”
- Caltag Medsystems LtdIssued 2023-08-31
“Failure to ensure that all inspection, measuring, and test equipment, including mechanical, automated, or electronic inspection and test equipment, is suitable for its intended purposes and is capable of producing valid results, as required by 21 CFR § 820.72(a).”
- Tesla BioHealing, Inc.Issued 2023-08-10
“Failure to adequately establish and maintain procedures to ensure equipment is routinely calibrated, inspected, checked, and maintained as required by 21 CFR 820.72(a).”
- Vitang Technology LLCIssued 2023-06-12
“Failure to establish and maintain adequate procedures to ensure that equipment is routinely calibrated, inspected, checked, and maintained, and to include provisions for handling, preservation, and storage of equipment, so that its accuracy and fitness for use are maintained, as required by 21 CFR 820.72(a).”
- Steiner Biotechnology, LLCIssued 2023-05-19
Often cited at the same inspection
Of the 1,070 inspections where FDA cited 21 CFR 820.72, the share where it also cited each of these sections.
- 21 CFR 820.100Corrective and preventive action577 (54%)
- 21 CFR 820.198Complaint files462 (43%)
- 21 CFR 820.50Purchasing controls349 (33%)
- 21 CFR 820.80Receiving, in-process, and finished device acceptance348 (33%)
- 21 CFR 820.30Design controls331 (31%)
- 21 CFR 820.70Production and process controls331 (31%)
Ask FDAgent about 21 CFR 820.72
FDAgent reads FDA's Form 483 citations, observations and warning letters and answers in plain English, with links to the records.
Related
About this data
- Citation counts come from FDA's Data Dashboard, which lists the regulation behind each Form 483 observation for inspections since October 2008.
- Observation excerpts come from Form 483 PDFs in FDA's electronic reading room, tied to this section only by exact wording as described above.
- A warning letter counts for this section when one of its numbered violation sentences cites 21 CFR 820.72; FDAgent quotes that sentence exactly.
- FDAgent rebuilds this page every week from FDA's public data and is independent of FDA.