FDA's inspection data lists 120 Form 483 citations of 21 CFR 820.60 at 114 facilities, from October 2008 to September 11, 2025. 2 warning letters state a violation of it. eCFR shows this section removed on February 4, 2026.
Counts: FDA Data Dashboard citations, last synced Nov 23, 2026, 04:25 UTC, and FDA's warning letters, last synced Nov 23, 2026, 04:17 UTC. Regulation text: eCFR. FDAgent is independent of FDA.
- Form 483 citations
- 120
- At 120 inspections
- Facilities cited
- 114
- Distinct FEIs
- Most recent citation
- Sep 11, 2025
- Precision Optics Corporation, Inc.
- Warning letters
- 2
- State a violation of it
The regulation
Removed from the CFR on 2026-02-04. The text shown is the last text in force before then (eCFR version of 2016-12-30).
§ 820.60 Identification.
Each manufacturer shall establish and maintain procedures for identifying product during all stages of receipt, production, distribution, and installation to prevent mixups.
21 CFR Part 820: Quality Management System Regulation, Subpart FRead on eCFR
Citations by year
Form 483 citations of 21 CFR 820.60 by the year the inspection ended. FDA's citation data starts with inspections ending in October 2008, and the current year runs to the latest sync, so both are partial years (lighter bars).
Peak: 16 in 2012
| Year | Form 483 citations |
|---|---|
| 2008 | 2 |
| 2009 | 8 |
| 2010 | 9 |
| 2011 | 7 |
| 2012 | 16 |
| 2013 | 8 |
| 2014 | 11 |
| 2015 | 9 |
| 2016 | 7 |
| 2017 | 6 |
| 2018 | 8 |
| 2019 | 5 |
| 2020 | 1 |
| 2021 | 2 |
| 2022 | 6 |
| 2023 | 5 |
| 2024 | 3 |
| 2025 | 7 |
How FDA words this citation
FDA's short descriptions and citation text on these 120 citations, most used first. These are FDA's standard summaries in its citation data, not the text of any one Form 483.
Short descriptions
- Identification procedures, Lack of or inadequate procedures120 citations
Citation text
- “Procedures for identifying product during all stages of receipt, production, distribution, and installation have not been adequately established.”58 citations
- “Procedures for identifying product during all stages of receipt, production, distribution, and installation have not been established.”48 citations
- “Procedures for identifying product throughout all stages of receipt, production, packaging, distribution, and installation were not complete and implemented.”3 citations
- “Procedures for identifying product throughout all stages of receipt, production, packaging, distribution, and installation were not defined and documented.”2 citations
Show 2 more
- “Procedures for identifying product throughout all stages of receipt, production, packaging, distribution, and installation were not established.”2 citations
- “Procedures for identifying product throughout all stages of receipt, production, packaging, distribution, and installation were not complete.”1 citations
Facilities cited most recently
The latest inspections where FDA cited 21 CFR 820.60, by inspection end date, with FDA's short description. Each links to the facility's FDA record on FDAgent.
- Precision Optics Corporation, Inc.2025-09-11 · FEI 1000120916Identification procedures, Lack of or inadequate procedures
- Hong Qiangxing (Shen Zhen) Electronics Limited2025-08-07 · FEI 3010402752Identification procedures, Lack of or inadequate procedures
- Carroll-Baccari Inc2025-08-05 · FEI 3017189082Identification procedures, Lack of or inadequate procedures
- NIMBLEHEART, INC2025-06-27 · FEI 3021219789Identification procedures, Lack of or inadequate procedures
- American Contract Systems Inc2025-06-02 · FEI 3008492337Identification procedures, Lack of or inadequate procedures
- The Richline Group Inc2025-04-16 · FEI 3006749547Identification procedures, Lack of or inadequate procedures
Show 4 more
- Neogen Corporation2025-04-07 · FEI 1120041Identification procedures, Lack of or inadequate procedures
- Medicraft, Inc.2024-11-27 · FEI 3009538923Identification procedures, Lack of or inadequate procedures
- GPS DENTAL LAB, INC2024-11-05 · FEI 3020064003Identification procedures, Lack of or inadequate procedures
- Eye-Novation, LLC2024-06-17 · FEI 3019482162Identification procedures, Lack of or inadequate procedures
Warning letters stating a violation of 21 CFR 820.60
2 warning letters FDA posted state a violation of this section in a numbered violation sentence. The most recent are below, each linking to FDAgent's page for the letter.
“Failure to adequately establish procedures for identifying product during all stages of receipt, production, distribution, and installation, as required by 21 CFR 820.60.”
- Hong Qiangxing Shenzhen Electronics LimitedIssued 2025-10-28
“Failure to adequately establish procedures for identifying product during all stages of receipt, production, distribution, and installation, as required by 21 CFR §820.60.”
- W.H.P.M, Inc.Issued 2022-06-30
Often cited at the same inspection
Of the 120 inspections where FDA cited 21 CFR 820.60, the share where it also cited each of these sections.
- 21 CFR 820.100Corrective and preventive action64 (53%)
- 21 CFR 820.198Complaint files62 (52%)
- 21 CFR 820.50Purchasing controls45 (38%)
- 21 CFR 820.70Production and process controls43 (36%)
- 21 CFR 820.80Receiving, in-process, and finished device acceptance43 (36%)
- 21 CFR 820.90Nonconforming product43 (36%)
Ask FDAgent about 21 CFR 820.60
FDAgent reads FDA's Form 483 citations, observations and warning letters and answers in plain English, with links to the records.
Related
About this data
- Citation counts come from FDA's Data Dashboard, which lists the regulation behind each Form 483 observation for inspections since October 2008.
- Observation excerpts come from Form 483 PDFs in FDA's electronic reading room, tied to this section only by exact wording as described above.
- A warning letter counts for this section when one of its numbered violation sentences cites 21 CFR 820.60; FDAgent quotes that sentence exactly.
- FDAgent rebuilds this page every week from FDA's public data and is independent of FDA.