Owens & Minor, Inc. dba American Contract Systems, Inc. warning letter, November 1, 2024
FDA's Center for Devices and Radiological Health issued this warning letter to Owens & Minor, Inc. dba American Contract Systems, Inc. of Mechanicsville, VA on November 1, 2024 and posted it on November 12, 2024. It states 2 violations, citing 21 CFR 820.80(b) and 820.30(a).
Source: FDA's warning letters, last synced Nov 23, 2026, 04:17 UTC. Read the full letter on fda.gov. FDAgent is independent of FDA.
- Issued
- Nov 1, 2024
- By CDRH
- Posted by FDA
- Nov 12, 2024
- 11 days after issue
- Subject
- CGMP/QSR/Medical Devices/Adulterated
- As FDA lists it
- FDA reference
- MARCS-CMS 695683
- FDA's case number
Violations FDA states in this letter
Each numbered violation sentence that cites 21 CFR, quoted exactly from the letter. The full letter below explains each one. A check means FDA's citation data also lists that section for the facility's August 14, 2024 inspection.
- 1
“Failure to establish and maintain procedures for acceptance of incoming product to ensure that incoming product is inspected, tested, or otherwise verified as conforming to specified requirements, and that acceptance or rejection is documented, as required by 21 CFR 820.80(b).”
21 CFR 820.80Receiving, in-process, and finished device acceptance2,540 Form 483 citations · 37 warning letters✓ Cited at the August 14, 2024 inspection - 2
“Failure to establish and maintain procedures to control the design of the device in order to ensure that specified design requirements are met, as required by 21 CFR 820.30(a).”
21 CFR 820.30Design controls6,018 Form 483 citations · 102 warning letters✓ Cited at the August 14, 2024 inspection
The facility
FDA's compliance action record for this letter (case 695683) names one facility. Each facility's FDA record on FDAgent has its full inspection history.
Inspections
- 2025-06-02OAI4 Form 483 citations
- 2024-08-14NAI4 Form 483 citations
- 2017-04-27NAINo Form 483 citations listed
- 2011-11-22VAI3 Form 483 citations
- 2011-01-14OAINo Form 483 citations listed
What FDA cited at the August 14, 2024 inspection
- 21 CFR 820.80(b)Lack of or inadequate receiving acceptance procedures
- 21 CFR 820.75(a)Documentation
- 21 CFR 820.20(b)Lack of or inadequate organizational structure
- 21 CFR 820.30(j)Design history file
The letter
FDA's text of the letter as posted on fda.gov. FDAgent leaves out the address block, the greeting and the copy list, which name the people it was sent to.
During an inspection of your firm, American Contract Systems, (ACS) Inc., in Tiffin OH, FEI 3008492337, on August 5 through 14, 2024, an investigator from the United States Food and Drug Administration (FDA) determined that your firm manufactures sterile convenience kits, such as the C-Section Pack (pack number WECS27G). Under section 201(h) of the Federal Food, Drug, and Cosmetic Act (the Act), 21 U.S.C. § 321(h), these products are devices because they are intended for use in the diagnosis of disease or other conditions or in the cure, mitigation, treatment, or prevention of disease, or to affect the structure or any function of the body.
This inspection revealed that these devices are adulterated within the meaning of section 501(h) of the Act, 21 U.S.C. § 351(h), in that the methods used in, or the facilities or controls used for, their manufacture, packing, storage, or installation are not in conformity with the current good manufacturing practice requirements of the Quality System regulation found at Title 21, Code of Federal Regulations (CFR), Part 820.
We received a response from Daniel R. Wright, VP, Global QARA, Owens & Minor, Inc., dated September 5, 2024, concerning our investigator’s observations noted on the Form FDA 483 (FDA 483), List of Inspectional Observations, that was issued to your firm. We address this response below, in relation to each of the noted violations. These violations include, but are not limited to, the following:
1. Failure to establish and maintain procedures for acceptance of incoming product to ensure that incoming product is inspected, tested, or otherwise verified as conforming to specified requirements, and that acceptance or rejection is documented, as required by 21 CFR 820.80(b). For example:
On at least four occasions, from January 2024 through July 2024, your firm accepted sterilization bag lots (86149183, 86471442, 86740750, 86149178) that failed your thickness requirements. Your Receiving Procedure, RV-01, includes minimum and maximum acceptance criteria for these bags to ensure they are free from defects that may adversely affect gas injection, sealing, or diffusion characteristics during your ethylene oxide (EO) sterilization processes. Acceptance activities for these 4 lots were being performed by ACS personnel at sister facilities in Florida. Each of these lots were deemed acceptable and the lots were used for EO processing at this Tiffin, OH facility, as well as other ACS facilities.
We reviewed your firm’s response and concluded that it is not adequate. You indicated that CAPA 2024-0021 was opened but did not provide a copy that describes the preventive actions you are planning to address this serious observation.
Your response states that on August 6, 2024, you placed a hold on all raw material sterilization bags at all ACS locations, including Tiffin, OH. All finished goods in ACS manufacturing locations and O&M distribution centers were then placed on distribution hold on August 7, 2024, while you investigated these failures. Your investigation included performing a retest of all available bags in inventory at your Fort Myers facility and you indicated that all retests passed your specifications. However, your response did not provide a systemic response describing how your firm will prevent this significant failure from recurring.
2. Failure to establish and maintain procedures to control the design of the device in order to ensure that specified design requirements are met, as required by 21 CFR 820.30(a).
You did not implement your Design Control Procedure, DE-01.
Specifically, your firm has not completed design verification and validation activities for 25 different FDA product codes in use at this facility, to ensure that all components being placed in your convenience kits have been reviewed and verified to undergo your sterilization process, as required by 21 CFR 820.30(g).
For example, two out of 26 components that are included in your C-Section Pack (pack number WECS27G) have not been verified as acceptable for your EO sterilization process. The “CAUTERY| ES ROCKER COATED SMOKE EVAC NS” is classified as a “medium” risk component and there was no documentation that this component was evaluated, as required by your “design verification and validation activities” that are described in your design control procedure.
Your Design Control Procedure, DE-01, requires component evaluation be performed as part of your design verification and validation process, including your C-Section Pack, designated as FDA Code OHM, class 2. The procedure also requires that all these review records be included in the design history file.
Also, your firm did not have complete design history files for 25 different FDA product codes being manufactured at your facility, as required by 21 CFR 820.30(j).
We reviewed your firm’s response and concluded that it is not adequate. You acknowledged documentation indicating component approval for products was lacking at this facility and were not part of your DHF’s. You now plan to remediate all components and approve all DHFs, by January 31, 2025, in part to ensure that all components being placed in your convenience kits have been reviewed and verified to undergo your sterilization process. Your firm did not provide enough detail to describe how you plan on prioritizing and implementing this review for all 25 product codes in use at this location.
(b)(4). As part of your response to this observation, please describe how you will complete this review of components to ensure that only devices with complete DHF’s, including complete component evaluations, are currently being distributed.
Your firm should take prompt action to address any violations identified in this letter. Failure to adequately address this matter may result in regulatory action being initiated by the FDA without further notice. These actions include, but are not limited to, seizure, injunction, and civil money penalties.
Other federal agencies may take your compliance with the FD&C Act and its implementing regulations into account when considering the award of federal contracts. Additionally, should FDA determine that you have Quality System regulation violations that are reasonably related to premarket approval applications for Class III devices, such devices will not be approved until the violations have been addressed. Should FDA determine that your devices or facilities do not meet the requirements of the Act, requests for Certificates to Foreign Governments (CFG) may not be granted.
Please notify this office in writing within fifteen business days from the date you receive this letter of the specific steps your firm has taken to address the noted violations, as well as an explanation of how your firm plans to prevent these violations, or similar violations, from occurring again. Include documentation of the corrections and/or corrective actions (which must address systemic problems) that your firm has taken. If your firm’s planned corrections and/or corrective actions will occur over time, please include a timetable for implementation of those activities. If corrections and/or corrective actions cannot be completed within fifteen business days, state the reason for the delay and the time within which these activities will be completed. Your firm’s response should be comprehensive and address any violations included in this Warning Letter. If you believe that your products are not in violation of the FD&C Act, include your reasoning and any supporting information for our consideration as part of your response.
Your firm’s response should be sent by email to CDRHWarningLetterResponses@fda.hhs.gov. Refer to CMS case # 695683 when replying. If you have any questions about the contents of this letter, please contact: Gina Brackett, EAT Assistant Director at (513) 288-7055 or gina.brackett@fda.hhs.gov.
Finally, you should know that this letter is not intended to be an all-inclusive list of the violations at your firm’s facility. It is your firm’s responsibility to ensure compliance with applicable laws and regulations administered by FDA. The specific violations noted in this letter and in the Inspectional Observations, FDA 483, issued at the close of the inspection may be symptomatic of serious problems in your firm’s manufacturing and quality management systems. Your firm should investigate and determine the causes of any violations and take prompt actions to address any violations and bring the products into compliance.
Sincerely yours, /S/
RDML Sean M. Boyd, MPH, USPHS Director Office of Regulatory Programs Office of Product Evaluation and Quality Center for Devices and Radiological Health
Ask FDAgent about this warning letter
FDAgent reads the letter, the facility's inspections and FDA's citations and answers in plain English, with links to the records.
Related
About this data
- The letter, its text, dates, issuing office and subject come from FDA's warning letter pages.
- FDAgent leaves out the letter's address block, greeting and copy list, which name the people it was sent to, and quotes each numbered violation sentence that cites 21 CFR.
- Facilities come from FDA's compliance action record for the letter's case number, or the one FEI the letter names; inspections and citations come from FDA's Data Dashboard.
- FDAgent is independent of FDA.