Torrent Pharmaceuticals Limited Form 483, April 2019
FDA issued this Form 483 to Torrent Pharmaceuticals Limited in Indrad, India (FEI 3005029956) at the end of a drug inspection that ended April 16, 2019. It lists 4 observations. FDA classified the inspection Official Action Indicated (OAI).
A Form 483 lists the investigators' observations at the end of an inspection. It is not FDA's final determination.
Source: FDA's Electronic Reading Room, posted May 2, 2019. Form 483 PDF on fda.gov. FDAgent is independent of FDA.
- Inspection ended
- Apr 16, 2019
- Drugs · Drug Quality Assurance
- FDA's outcome
- OAI
- Official Action Indicated
- Posted by FDA
- May 2, 2019
- 16 days after the inspection
The 4 observations on this Form 483
Read from the FDA-posted Form 483 PDF by OCR. FDAgent keeps an observation only when it matches the scanned text; check the PDF before quoting. The short titles are FDAgent's.
- 1
Failure to thoroughly review OOS discrepancies
There is a failure to thoroughly review any unexplained discrepancy and the failure of a batch or any of its components to meet any of its specifications whether or not the batch has been already distributed. Specifically, The summary of OOS investigations conducted by the firm during the period beginning from January 2017 to March 2019 is as follows: 2017 to 2019 Valid Invalid % Invalid Finished Product 340* 93 247 73% Stability 203* 80 123 61% *excludes on-going investigations at the time of inspection Review of the firm's OOS investigation revealed that the firm's investigation practices and procedure(s) are deficient. Several examples were found where the original failing results were invalidated without a scientifically sound and justifiable root cause, and results of passing re-test results were reported as the result of record. Examples include, but are not limited to, the following OOS investigations: (A) OOS Investigation Number OOS/IN/F/FP/17/233 for (b)(4) and (b)(4) Tablets (b) mg/(b) mg pertaining to batch number (b)(4) was initiated on 07/01/17 to probe the following OOS results generated during (b)(4) testing for Assay: (b)(4) Mean RSD% (b)(4) 102.8 5.57 (b)(4) 97.3 1.74 Specification* Mean: (b)(4) to (b)(4)% of label amount Individual: (b) to (b)% /(4) /(4) *as in the OOS report The OOS results were confirmed during preliminary investigation and hypothesis testing (Phase I) with no identified root cause. No manufacturing error was identified during Phase II investigation. The initial OOS results were invalidated based on reserve sample testing of set (b)(4) sample sets. The higher Assay results were invalidated without identifying a definitive root cause. The manufacturing process of this product consists of a (b)(4) process. The investigation could not conclusively identify if there is any laboratory error or manufacturing error and no CAPA was initiated. The (b)(4) was released using re-tested reserve sample set results. (b)(4) was released to U.S. market with an expiry date of (b)(4). In addition, the documents provided to the investigators in support of OOS Investigation Number OOS/IN/F/FP/17/233 included an unsigned OOS Amendment Report. This document had a print date of 8/27/2018. (B) OOS Investigation Number OOS/IN/F/FP/17/238 for (b)(4) and (b)(4) Tablets (b) mg/(b)(4) mg pertaining to batch number (b)(4) was initiated on 7/4/17 to probe the following OOS results generated during (b)(4) testing for Assay: (b)(4) Mean RSD% (b)(4) 100.7 2.13 (b)(4) 103.7 9.24 Specification* Mean: (b)(4) to (b)(4)% of Label Claim Individual: (b)(4) to (b)(4)% *as in the OOS report The OOS results were confirmed during preliminary investigation and hypothesis testing (Phase I) with no identified root cause. No manufacturing error was identified during Phase II investigation. The initial OOS results were invalidated based on reserve sample testing of set (b)(4) sample sets. The higher Assay results were invalidated without identifying a definitive root cause. The manufacturing process of this product consists of a (b)(4) process. The investigation could not conclusively identify if there is any laboratory error or manufacturing error and no CAPA was initiated. The (b)(4) was released using re-tested reserve sample set results. (b)(4) was released to the U.S. market with an expiry date of (b)(4). (C) The same deficient investigative process as in (A) and (B) above was followed to probe (b)(4) Assay failure in OOS/IN/F/FP/18/070 for (b)(4) and (b)(4) Tablets (b)(4) mg/(b)(4) mg tablets pertaining to batch number (b)(4) (Expires (b)(4)). No definitive root cause was identified. (D) OOS Investigation Number OOS/IN/F/FP/17/340 for (b)(4) Capsules USP (b)(4) mg for PV batch number (b)(4) was initiated on 11/06/17 to probe the failing (b)(4) result as follows: (b)(4) Mean RSD% (b)(4)(%) 97.4 1.07 Sample Wt. (mg). Specification NLT (b)(4)% and NMT (b)(4)% of Label Claim, RSD NMT (b)(4)% The OOS results were confirmed during prelimin
Shortened here; the PDF has the full text.
- 2
No written production process control procedures
There are no written procedures for production and process controls designed to assure that the drug products have the identity, strength, quality, and purity they purport or are represented to possess. Specifically, Review of Process Validation (PV) documents revealed that PV batches that failed process validation protocol requirements and quality attributes were deemed acceptable and counted towards successful manufacturing process validation. For example, Process Validation for (b)(4) Tablets USP (b)(4) mg, and (b)(4) Tablets USP (b)(4) mg for qualifying an alternate API code (#(b)(4)) is deficient. All process validation batches were rejected as summarized below: Strength (b)(4) mg (b)(4) mg Total PV batches 4 3 Total OOS investigations 6 3 Batch Disposition All rejected All rejected (A) Process Validation for (b)(4) Tablets USP (b)(4) mg The following OOS investigations were initiated during testing of process validation batches: OOS No. OOS/IN/F/FP/16/257 OOS/IN/F/FP/16/137 Date of Initiation 9/29/16 7/23/16 Batch #(b)(4) PV Number 1 1 1 Test Results F2 = (b)(4) Assay = (b)(4)% (b)(4)*(min) = (b)(4)% Specification F2 NLT (b)(4) (b)(4)-(b)(4)% OOS/IN/F/FP/16/263 10/4/16 (b)(4) 1 (b)(4)% NMT (b)(4)% (b)(4) (b)(4) Due to the failures, an additional PV batch (#4) was added to the validation campaign. However, the 4th batch failed for F2 dissolution similarity factor as follows: OOS No. Date of Initiation Batch # PV Number Test Results F2 Specification OOS/IN/F/FP/17/139 4/10/17 (b)(4) 4 F2 = (b)(4) F2 NLT (b)(4) OOS/IN/F/FP/17/143 4/10/17 4 F2 = (b)(4) F2 NLT (b)(4) PV batches (b)(4) (PV# 1) and (b)(4) (PV# 4) were rejected and destroyed leading to only 2 successful process validation batches. The firm's quality unit also rejected the remaining 2 batches. Despite the PV batch failures and rejections, the process validation for the alternate API vendor was deemed successful per interim validation report # PVR/BTL.508.01-33E/18, approved on 01/17/18. (B) Process Validation for (b)(4) Tablets USP (b)(4) mg The process validation initiated to qualify an alternate API supplier (#(b)(4)) for (b)(4) Tablets USP (b)(4) mg is deficient. Three process validation batches were rejected and destroyed based on OOS investigations for (b)(4) failures. However, despite the critical attribute (i.e. (b)(4) failures), the manufacturing process utilizing the alternate API supplier was still considered valid and acceptable by the Quality Unit. The process validation report # PVR/BTL.510.01-40E/18, approved on 01/05/18 stated that during further review, the route of synthesis for the old API code ((b)(4)) and the new API code ((b)(4)) are only marginally different and would not impact the quality of the finished product. In both cases (A) and (B) above, the respective process validation report states the following: Due to change in API there is no impact on manufacturing process & no impact of API quality on finished goods So API code (b)(4) shall be used for commercial and it is recommended to abort validation for further commercial batches in SFG code: (b)(4) and regular commercial batches shall be manufactured with same parameter which are available of SFG code (b)(4) as there is no change in process parameter. The batch disposition status for the (b)(4) mg and (b)(4) mg batches manufactured and released to U.S. market with alternate API code (b)(4) is as follows. Product Batch status Count (b)(4) Tab, USP (b) mg Hold 3 Rejected 5 Released (b)(4) (b)(4) Tab, USP (b) mg Hold 4 Rejected 3 Released (b)(4) Grand Total (C) Process Validation for Lamotrigine ER Tablets 200 mg The process validation for Lamotrigine ER Tablets 200 mg is deficient. The pre-validation risk assessment to determine the number of batches required to successfully demonstrate process validation is not scientifically sound. For example, the risk assessment detailed in the process validation protocol (PV/BTL.524.01-5E/17/01-01, approved on 11/04/17) considered the functional co
Shortened here; the PDF has the full text.
- 3
Routine calibration of automatic equipment deficient
Routine calibration of automatic and electronic equipment is not performed according to a written program designed to assure proper performance. Specifically, The qualification of Tablet (b)(4) machine (equipment ID# (b)(4)-03) is deficient. This equipment is proposed for the commercial manufacturing of (b)(4) tablets ((b)(4) and (b) mg) for (b)(4) #(b)(4) and (b)(4) Tablets ((b)(4) and (b) mg) for (b)(4) #(b)(4). The following issues were observed during the inspection: Per equipment (b)(4)-03 maintenance manual, the required calibration includes the (b)(4) and the (b)(4) USB interface. These parameters are critical for the quality of the tablet (b)(4) process. The general manager of Engineering department provided the current equipment calibration certificate for equipment (b)(4)-03 with Certificate number TPL/T/0196/01/19. This certificate did not include the two required calibration items. The last calibration provided by the equipment manufacturer expired in January 2019. Additionally, the production operators purportedly trained on the operational aspects of (b)(4)-03 confirmed that they do not know how to set up the vision profile settings for the vision inspection system on the machine. The vision system ensures that the (b)(4) tablets conform to in-process specification limits. A service engineer representative also confirmed that he is unaware of how to correctly setup the vision inspection system. Consequently, during the (b)(4) process demonstration on 04/12/19, several false rejects were found in the reject chute associated with the vision check cameras on the equipment thus providing no assurance of the optimum functionality of the vision system.
- 4
API out-of-specification investigation deficient
Out of Specification Investigation for API products is deficient. Specifically, OOS Investigation Number OOS/IN/A/ST/17/013 for (b)(4) pertaining to batch number (b)(4), was initiated on 03/06/17 to probe the following OOS results generated during Assay testing at the 12M time point (25°C/60%RH and 30°C/75%RH): 25°C/60%RH: (b)(4)% 30°C/75%RH: % Note: Specification is NLT (b)% and NMT (b)(4)% (on Anhydrous basis) As part of hypothesis (Phase I), a re-dilution study was not considered using the diluent allowed by the method to rule out any dilution error. Additionally, a service engineer for the instrument confirmed that there was no instrument failure during initial or hypothesis testing. However, instrument error was still suspected and substantiated by intentionally pumping air bubble into the system and the standard injections yielded results higher than the specification limits. Furthermore, since the method validation for solution stability was deficiently established only for (b)(4), a second set of samples was analyzed in duplicate to invalidate the original failing results. Passing results from initial sequence for other batches were also discarded, and re-tested results were reported without a valid justification. No consideration was given to report the average of all passing results when a definitive root cause is not identified.
After this inspection
FDA's compliance actions for this FEI dated after this inspection and before its next one. FDAgent links a letter when FDA's case number ties it to this facility.
- Warning LetterOct 8, 2019CDER · 175 days after this inspection ended
Other Form 483s FDA posted for this facility
Every Form 483 FDA posts under FEI 3005029956, newest first.
- Form 483, June 2024Inspection ended Jun 12, 2024 · Posted Jun 26, 2024VAI
- Form 483, April 2017Inspection ended Apr 28, 2017 · Posted May 11, 2017VAI
Ask FDAgent about this Form 483
FDAgent reads the 483, the facility's inspections, warning letters and FDA's citations and answers in plain English, with links to the records.
Related
About this data
- The PDF and its dates come from FDA's Electronic Reading Room, last synced Nov 23, 2026, 04:33 UTC; the inspection, its outcome and FDA's citations from FDA's Data Dashboard.
- The observations are the text FDAgent read from this PDF by OCR, shown only when every printed observation passed FDAgent’s checks against the scanned text.
- FDAgent leaves out the names of the people the Form 483 is addressed to and of the investigators.
- FDAgent is independent of FDA.