Sun Pharmaceuticals Industries, Inc. Form 483, November 2016
FDA issued this Form 483 to Sun Pharmaceuticals Industries, Inc. in Mohali, India (FEI 3002807979) at the end of a drug inspection that ended November 16, 2016. It lists 7 observations. FDA classified the inspection Voluntary Action Indicated (VAI).
A Form 483 lists the investigators' observations at the end of an inspection. It is not FDA's final determination.
Source: FDA's Electronic Reading Room, posted Aug 9, 2018. Form 483 PDF on fda.gov. FDAgent is independent of FDA.
- Inspection ended
- Nov 16, 2016
- Drugs · Drug Quality Assurance
- FDA's outcome
- VAI
- Voluntary Action Indicated
- Posted by FDA
- Aug 9, 2018
- 631 days after the inspection
The 7 observations on this Form 483
Read from the FDA-posted Form 483 PDF by OCR. FDAgent keeps an observation only when it matches the scanned text; check the PDF before quoting. The short titles are FDAgent's.
- 1
OOS investigations; IR analyst training deficiency
There is a failure to thoroughly review the failure of a batch or any of its components to meet any of its specifications whether or not the batch has been already distributed. Specifically, a. Tablets @mg, written OOS investigation #217272, was opened on 22 April 2016 and closed on 06 June 2016 for related substance test of of © The failing result obtained on 20 April 2016 for batch # OO%as © % with specification of NMT ” “%. Three additional batches were associated with the investigation batches # RL: © Oand # © Oyith falling results of Oy, © and PN ( of) respectively. The laboratory investigation revealed no laboratory error after sample re-analysis. A full investigation was done in production and a non-assignable cause was identified. The batches associated with the event were released to the market in the month of March 2016. The impurity specification of CONMT® “yy for finished dosage form was changed in line with the EP pharmacopeia specification @ “hy tor © AP] after these OOS results were obtained to justify the release of the ©@Tablet batches. Additionally, the firm's did not follow SOP #OP013156, entitled, Handling of Out of Specification Results (OOS) which requires the batch disposition of rejected if the OOS result was found valid. b. Tablets omg and (mg, written OOS investigation #221781, was opened on 28 May 2016 and closed on 07 June 2016 for IR test identification. The investigation was regarding the analyses of batches rel HQ #9 #0 HR Go and © performed on 23 May 2016 that did not comply with the wavenumbers ©“+ {5 “+” and ®“+ © On 10 November 2016, during the laboratory tour I interviewed the analyst who performed the IR identification analyses (* ®) and he stated that he performed the IR identity test without being trained in the IR identification of the finished product test of © ®iablets. The firm failed to train and qualify the analyst in the IR identification of Tablets prior to assigning finished product samples to be analyzed by IR.
- 2
Incomplete laboratory repeat-testing records
Laboratory records do not include complete data derived from all tests, examinations and assay necessary to assure compliance with established specifications and standards. Specifically, There is a failure to document repeat testing in the laboratory equipment logbook when samples are reanalyzed from the same sample preparation vial. On October 29, 2016, raw material batch (BX was tested twice for “and © “Bement via Atomic Absorption Spectrometry (AAS) due to invalidated runs. However, the AAS equipment logbook does not show that repeat analysis was performed. In addition on April 27, 2016, © @patch © “uvas tested for “content via AAS three times due to invalidated runs but the equipment logbook only shows that the batch was tested twice.
- 3
No password protection on lab balance
Appropriate controls are not exercised over computers or related systems to assure that changes in master production and control records or other records are instituted only by authorized personnel. Specifically, There is no password protection for the Sartorius GP3202 precision balance instrument ID MQABAL04 that is used in the quality control testing laboratory to weigh for analysis. Laboratory analysts have the ability to change instrument settings including date and time on the instrument.
- 4
In-process testing and specifications lacking
Examination and testing of samples is not done to assure that in-process materials conform to specifications. Specifically, Raw material used by your firm for manufacturing of “ng and @mg tablets, is reprocessed and in manufacturing operations. Your firm keeps as "7g specification solely for testing of" However, the®® “ specification is pe to that of the incoming aw material. There is no fugtification for the use of a” test for the ©“ or the®*® range listed in the » specification. While V.Y., Regional Quality Head claims the ®® or "processing of © “is used to improve tablet range, there is no data showing direct correlation between OE and finished tablet
- 5
QC lacks review authority over production systems
The quality control unit lacks authority to review production records to assure that no errors have occurred. Specifically, SOP OPO13152 "Good Documentation Practices (GDP)" effective date July 28, 2016 explains that Quality Assurance is to periodically review electronic data as a part of self-inspection. However, periodic review of electronic data is only being performed for the quality control testing laboratory and is not being is not performed for the programmable logic controller (PLC) and automated systems located in the production area. Regarding this, a. Quality assurance does not periodically review the alarms generated in the automated systems and the only automated equipment alarms that are being reviewed are the ones that production operators document in the batch production records that cause an equipment stoppage during a production run. b. Event logs (audit trails) generated in the human machine interface automated compression machine are not periodically reviewed by quality assurance for disassembly, cleaning, change over and preventative maintenance. Quality assurance only reviews the hard copy printout event logs printed by production personnel and attached in the batch production record after the completion of a compression batch that document the activities performed between the start and stop of a production run. c. On November 9, 2016, during a walk-through of the production area, we observed an error message prompt on the human machine interface automated compression machine equipment ID MPDRCMO1 that read the following: "valid"? is required". According to production operators in the area, the error message has been appearing for months on the equipment. However, quality assurance was not notified of the error message prompt on the machine and there was no associated investigation into the issue.
- 6
Obsolete procedures accessible in DMS
The quality control unit lacks responsibility to reject all procedures or specifications impacting on the quality of drug products. Specifically, Previously retired versions of standard operating procedures and forms are accessible for viewing for the end users of the electronic document management system entitled "Documentum Compliance Manager". A general search on the electronic document management system allows the end users to access these obsolete procedures.
- 7
Lack of CPP rationale and supporting data
There are no written procedures for production and process controls designed to assure that the drug products have the identity, strength, quality, and purity they purport or are represented to possess. Specifically, Critical Process Parameter (CPP) 105 Tablet distance processing range for the tablet process is established as cm to cm in the batch production record. However, there is no rationale or data to support the establishment of this range. Regarding this, Machine equipment qualification performed under Performance Qualification Protocol/Report of Machine Equipment Number MPDGAC03 Protocol No. PQ-MRL 12-00 approved on September 4, 2010 was performed at a set to distance value of @:m. Product development report titled Addendum II to Feasability Trial Report of Tablets mg report FSTR/03/0212-A02, approved on April 18, 2012 was performed at a to 5 distance range value of m to wom. Process validation report titled Process Performance Qualification (PPQ) Report of (Compression and Document R/E/PPQ/15/016/01, approved on March 14, 2016 was performed at a set to distance value of @:m.
Other Form 483s FDA posted for this facility
Every Form 483 FDA posts under FEI 3002807979, newest first.
- Form 483, August 2022Inspection ended Aug 12, 2022 · Posted Aug 18, 2022OAI
Ask FDAgent about this Form 483
FDAgent reads the 483, the facility's inspections, warning letters and FDA's citations and answers in plain English, with links to the records.
Related
About this data
- The PDF and its dates come from FDA's Electronic Reading Room, last synced Nov 23, 2026, 04:33 UTC; the inspection, its outcome and FDA's citations from FDA's Data Dashboard.
- The observations are the text FDAgent read from this PDF by OCR, shown only when every printed observation passed FDAgent’s checks against the scanned text.
- FDAgent leaves out the names of the people the Form 483 is addressed to and of the investigators.
- FDAgent is independent of FDA.