Skip to content

Farmakeio Outsourcing LLC Form 483, September 2025

FDA issued this Form 483 to Farmakeio Outsourcing LLC in Southlake, TX (FEI 3014982757) at the end of an inspection that ran from August 18 to September 5, 2025. It lists 5 observations.

A Form 483 lists the investigators' observations at the end of an inspection. It is not FDA's final determination.

Source: FDA's Electronic Reading Room, posted Dec 2, 2025. Form 483 PDF on fda.gov. FDAgent is independent of FDA.

Inspection
Aug 18–Sep 5, 2025
Outsourcing Facility
FDA's outcome
Not classified
Not classified yet
Posted by FDA
Dec 2, 2025
88 days after the inspection
Facility
FEI 3014982757
Southlake, TX

The 5 observations on this Form 483

Read from the FDA-posted Form 483 PDF by OCR. FDAgent keeps an observation only when it matches the scanned text; check the PDF before quoting. The short titles are FDAgent's.

  1. 1

    Failure to investigate metal and complaints

    There is a failure to thoroughly review any unexplained discrepancy and the failure of a batch or any of its components to meet any of its specifications whether or not the batch has been already distributed. Specifically, A. Your firm failed to adequately investigate and initiate corrective and preventive actions for CAPA #, CAPA-2025-0002 dated 03 Apr 2025, which documents metal shavings being found during Testosterone/Triamcinolone Acetonide granulation resulting from a worn impeller shaft seal and metal fit ring. Your firm failed to identify and or confirm how long the shaft and ring had been worn and or expand the investigation beyond immediately manufactured batches, and into other manufactured finished sterile implantable distributed pellets, e.g., Testosterone Pellet (Product Strengths: 200mg, Lot 3203, Expiry 2/17/202026; 87.5mg, Lot 3193, Expiry 2/17/2026; 62.5mg, Lot 3180, Expiry 2/17/2026; & 50mg, Lot 3179, Expiry 2/17/2026) from Testosterone Granulation [illegible] Expiry 2/17/2026. Additionally, your firm's metal detection system for finished pellets was not operational until May 19, 2025, metal detection performance qualification (PQ) quality unit approval date. Before this date, no finished pellets underwent metal detection as part of its manufacturing process. The [(D)(4)] intermediate product, which is (b)(4) and then processed into pellets, was visually inspected, packaged, [(6)(4)] sterilized, and distributed without this critical check. B. Your firm failed to adequately investigate received customer complaints. For example: 1. COMP-2025-0023 dated 6/20/2025 and COMP-2025-0018 dated 5/23/2025, documents received complaints for cracked pellets. Your firm's failed to adequately investigate the source of cracked pellets within your firm's manufacturing process and expand investigation into all area including distribution. 2. COMP-2025-0002 dated 1/04/2025 - documents received complaint for incorrect pellets distributed. Your customer ordered a [(b)(4)] count packages box of Testosterone/Triamcinolone Pellet (25MG/5MCG), but received Estradiol 25mg pellets. Your firm failed to adequately investigate the product's secondary packaging mix-up.

  2. 2

    Inadequate laboratory specifications/tests

    Laboratory controls do not include the establishment of scientifically sound and appropriate specifications and test procedures designed to assure that drug products conform to appropriate standards of identity, strength, quality and purity. Specifically, A. During a review of your firm's batch record for Product ID#364, Testosterone/Triamcinolone Acetonide Pellet (200mg/40mcg), Lot# 3131, including laboratory test chromatograms, unknown/unidentified peaks were found during sampling testing prior to and following [(b)(4)] - sterilization. Your firm's management reported they are aware of the unknown peaks and at the time of this inspection is working with a contract testing laboratory to identify and determine the pharmacological activity of the foreign peaks for the Testosterone/Triamcinolone Acetonide pellets. Your firm released and distributed this lot and continued producing and distributing more lots of this pellet product without identifying the unknowns. B. Testosterone/Triamcinolone Acetonide Granulation 95%/0.02% Chemical Lot [(b)(4)] Expiry 1/29/2026, Qty. [(b)(4)]; and Lot [(b)(4)] Expiry 2/03/2026, Qty. [(b)(4)] were used to produce Product ID#364, Testosterone/Triamcinolone Acetonide Pellet (200mg/40mcg), Lot#3131. A review of the granulation batch record found your firm failed to establish scientifically sound and appropriate specification for the addition of the API, Triamcinolone Acetonide to the batch in the amount of 0.3g (Specification [(b)(4)]) instead of [(b)(4)] as expected to be in the final formulation of the pellet. This was documented in both granulation batches. This is [(b)(4)] in excess. C. After metal shavings were found in your Testosterone/Triamcinolone Acetonide granulation lots, your firm decided to scan pellets through a metal scanner. However, the sample size of the batch was determined using [(b)(4)] Standard [(b)(4)]: A sample size, ~bX4~ pellets for batch size [(b)(4)] to [(b)(4)] was selected using General Inspection Level III. Your firm failed to comply with USP <790>, which allows AQL, as a sampling requirement at batch release to be conducted "After 100% Manufacturing Inspection."

  3. 3

    No dissolution testing for controlled-release

    Each batch of controlled-release dosage form drug product is not laboratory tested to determine conformance to the specifications for the rate of release for each active ingredient. Specifically, your firm failed to require or perform dissolution testing on each batch of controlled-release dosage form drug product. The drug product is not laboratory tested to determine conformance to the specifications at a rate of release for each active ingredient that is reproducible. At the time of this FDA inspection, your firm failed to adequately define a dissolution specification for the following pellet product families. A. Testosterone Regular Release Pellet (Contains no Ethylcellulose excipient); Product Strengths: 200mg & 50mg; BUD 365 days. B. Testosterone Pellet (Contains Ethylcellulose excipient); Product Strengths: 200mg, 100mg, 87.5mg, 62.5mg, 50mg, 37.5mg, 25mg, & 12.5mg; BUD 365 days. C. Testosterone/Triamcinolone Acetonide Pellet; Product Strengths: 200mg/40mcg, 100mg/20mcg, 87.5mg/17.5mcg, 62.5mg/12.5 mcg, 50mg/10mcg, 37.5mg/7.5mcg, 25mg/5mcg, & 12.5mg/2.5mcg; BUD 365 days. D. Estradiol Pellet; Product Strengths: 25mg, 20mg, 18mg, 15mg, 12.5mg, 10mg, & 6mg; BUD 365 days.

  4. 4

    Inadequate equipment design and PQ

    Equipment used in the manufacture, processing, packing or holding of drug products is not of appropriate design and of adequate size to facilitate operations for its intended use. Specifically, A. Your firm's [(b)(4)] Systems, [(6)(4)] Metal detection System qualification failed to show the equipment is adequately designed and sized to facilitate operations for its intended use. During a review of your firm's [(b)(4)], Pharmaceutical Metal Detector Performance Qualification Manual, Approval Date 5/19/2025, the PQ acceptance criteria was found inadequate, and failed to require specifications for the test equipment and materials. For example, within Section 7.2.2, Acceptance Criteria, your firm failed to quantify (based on [(b)(4)]) acceptance and reject allowances for [(b)(4)] and 0[(b)(4)] tablets or test samples. Additionally, in Section 7.2.3, Test Equipment and Materials, your firm failed to quantify how many total samples shall be used for each type (i.e., [(b)(4)], [(b)(4)] and [(b)(4)]) as part of the production equipment qualification. Your firm COO reported a total of [(b)(4)] pellets and 0[(b)(4)] pellet was used in the study for each contaminate pellet type. B. During a review of your firm initiated CAPA-2025-002, Finding foreign material - granulation process, your firm documented the root cause for the origin of the foreign material resulted from the granulator impeller shaft grinding against the [(b)(4)]. A preventive maintenance (PM) was added for the [(b)(4)] - Lab Grinder to include an inspection the [(b)(4)] before running the granulator. Your firm failed to include in the PM an inspection of the impeller shaft and the [(b)(4)] for excessive wear based on investigation findings.

  5. 5

    Calibration and equipment checks inadequate

    Routine calibration and checking of automatic and electronic equipment is not performed according to a written program designed to assure proper performance. Specifically, during a review of your firm's batch record for Testosterone/Triamcinolone Acetonide Pellet 200mg/40mcg, Lot 3468, Expiry 7/23/2026, Sections 2.3.1.3 - 2.3.1.5, document pellets being processed through the [(b)(4)] Systems, [(6)(4)] Metal detection System. Section 2.3.1.5, states [(b)(4)]. Your firm's batch record fail to define and document the type of each sample shall be used, number of control samples, and the frequency during pellet processing to ensure proper performance.

Other Form 483s FDA posted for this facility

Every Form 483 FDA posts under FEI 3014982757, newest first.

All inspections at this facility →

Ask FDAgent about this Form 483

FDAgent reads the 483, the facility's inspections, warning letters and FDA's citations and answers in plain English, with links to the records.

Edit it or ask as written. 3 questions free, no card needed.

About this data

  • The PDF and its dates come from FDA's Electronic Reading Room, last synced Nov 23, 2026, 04:33 UTC; the inspection, its outcome and FDA's citations from FDA's Data Dashboard.
  • The observations are the text FDAgent read from this PDF by OCR, shown only when every printed observation passed FDAgent’s checks against the scanned text.
  • FDAgent leaves out the names of the people the Form 483 is addressed to and of the investigators.
  • FDAgent is independent of FDA.