Isorx Cyclotron Center Form 483, March 2026

FDA issued this Form 483 to Isorx Cyclotron Center in Texas (FEI 3021621451) at the end of an inspection that ran from March 9 to March 13, 2026. It lists 7 observations.

A Form 483 lists the investigators' observations at the end of an inspection. It is not FDA's final determination.

Source: FDA's Electronic Reading Room, posted Jul 10, 2026. Form 483 PDF on fda.gov. FDAgent is independent of FDA.

Inspection
Mar 9–13, 2026
—
FDA's outcome
Not classified
Not classified yet
Posted by FDA
Jul 10, 2026
119 days after the inspection
Facility
FEI 3021621451
Texas

The 7 observations on this Form 483

Read from the FDA-posted Form 483 PDF by OCR. FDAgent keeps an observation only when it matches the scanned text; check the PDF before quoting. The short titles are FDAgent's.

  1. 1

    Inadequate batch production records

    Permitted variations in the amount of component necessary are not reasonable and not specified in the master production and control records. Your master production and control records did not include a statement of action limits on radiochemical yield. Your master production and control records did not include complete special notations and precautions to be followed. Specifically, A. You did not include the recording and reconciliation of all inputs and outputs in your production batch records to demonstrate that your production process is in a state of control and that you can consistently produce predictable batch yield and quality. For example, the following batches have varied cyclotron irradiation times from (b) (4); varied cyclotron charge amount; cyclotron calculated radioactivity generated; and resulting ® © radioactivity at Start of Synthesis (SOS); final product vial (FPV) radioactivity at end of synthesis (EOS); and assay concentration from (b) (4). The firm has not included the cyclotron inputs in the batch record as a function of batch scale and has not reconciled that with the final product yield to demonstrate consistent and expected results. B. The batch records produced by the firm lack consistent information and process. Batches were produced with varied cyclotron power from (Bb) (4) charge and varied irradiation times from (b) (4). The radiation dose produced in the final product vial varied from (BD) (4). The firm has not calculated an acceptable lowest and acceptable highest range of input and finished product output, that can realistically accommodate patient doses. The inconsistent production processes and record do not provide a valid evaluation for process control. C. The batch records lack a stated purpose designating the production as development, engineering, or GMP. After errors were identified in some batch records, the firm reported that some batches were for R&D, development, engineering runs, or because there was a long gap in production activity, or that the firm did not have a specific reason for the batch. This reason was given for use of expired reagents, varied cyclotron power and run times, and missing information between batch records. But this is not justified with intended purpose or batch scale planned prior to the execution of the batch. Additionally, batch records do not include information about deviations or environmental monitoring excursions and sometimes have missing forms for incoming material log.

  2. 2

    Missing/inconsistent product labeling

    Your batch production record did not include labeling. Specifically, During the review of batch records we found inconsistencies with batch record product and shield/packaging labels. For example: PPQ batch records (b) (4) and batch (b) (4) contain a single product vial label with lot number, date, total activity, volume, and expiration date and time. Batch records (b) (4) contain a single vial label but this label is different from the batches above as it only contains lot number, date, and expiry date and time, but not activity. Batch (b) (4) did not have any product labels. Batch record (b) (4) contains a vial label and shield label, but the expiration times were inconsistent and the total activity at End of Synthesis (EOS) was incorrectly reporting the larger activity for start of synthesis.

  3. 3

    Failure to review production records

    You did not review production records to determine whether errors had occurred. Specifically, A. Expired reagents and materials were used in the production of PET batches, including but not limited to the following: Batch Record (b) (4) was produced using ®® expired (b) (4) Lot expired 10/2025, and (b) (4) unit Lot (b) (4) expired 2025/09. This was not documented in the batch record as a deviation nor was it noted on the deviation log. Batch Record (b) (4) labeling discrepancies. Product vial label has expiry time of (b) (4) at (b) (4) label had expiry time (b) (4). Also, the incorrect ®@ activity @ EOS (b) (4) is the starting level however the label should have the level after the process was completed which was (BD) (4); no documentation in the batch record as a deviation nor was it noted on the deviation log. Expired (0) (4) (b) (4) Lot (b) (4) expired 2025-12-31 were used with no documentation in the batch record as a deviation nor was it noted on the deviation log. B. The firm lacks an effective material management and inventory tracking system to prevent mix-ups of expired materials and reagents from being used for GMP production and does not designate non-GMP development batches with planned deviations to account for use of expired materials.

  4. 4

    Inadequate environmental monitoring

    You did not establish and follow written quality assurance procedures. Specifically, Your firm did not establish adequate environmental monitoring procedures to ensure that the ISO-5, ISO-7, and ISO-8 classified areas used to produce (b) (4) PET drugs are consistently made in safe environmental conditions. Standard Operating Procedure DOC-417, Environmental Monitoring Policy, version 1.1, effective 11/18/2025, describes that environmental monitoring sampling and testing will be conducted after (0) (b) (4) and by third party vendor (b) (4) HEPA filter recertifications, and additionally (BD) (4) even when there is not activity. (b) (4) EM has not been done over the past 2 years, from the period of 4/24/2024, when the ®ppQ batches were produced, up to 2/15/2026. The firm has not conducted and trended EM results to demonstrate that the cleaning and disinfection procedures and (B) (4) EM monitoring is adequate. A summary of HEPA filter recertification and EM results by (b) (4) is listed in the table below. Microbial excursions and HEPA filter failures were reported for the 6 months from June — December 2025, but the firm has not completed a comprehensive CAPA to address potential root cause(s). Date of Test / Activity Results Filter Number, Area 12/29/2025 Pass HEPA recertification 12/15/2025 Remodel / Ceiling Tiles removed, new HEPA filter(s) installed. No cleaning records, no environmental monitoring records. 10/30/2025 Fail HEPA recertification. (b) (4) ISO-7 Cleanroom 9/17/2025 Out of Compliance HEPA check. 12 CFUs, Viable Active Air, ISO-7 Cleanroom 6/9/2025 Out of Compliance HEPA check. Alert 2 CFUs Viable Active Air and 2 CFUs Viable Surface, ISO-8 Ante Room. The firm has not conducted and documented thorough cleaning and disinfection of ISO-5, ISO-7, and ISO-8 classified areas after significant interventions by non-employees. This includes 6 instances over the past year when ®® technicians conducted HEPA filter recertification and 2 instances of smoke studies. This includes construction / remodeling done in December 2025 to remove ceiling tiles in the ISO-7 cleanroom, exposure of the classified space to the ceiling crawlspace, installation of new HEPA filter(s), reinstalling ceiling tiles, application of sealants and paint. During the inspection of the ISO-7 cleanroom between 3/10-12/2026, deficiencies were observed with the cleanroom. For example: The ISO-7 cleanroom is not constructed to ensure controlled separation between the ISO-7 space and the uncontrolled air in the shipping room. The outgoing (b) (4) had gaps between the (D) (4) on the inside room (b) (4) door. The outer (b) (4) door was warped resulting in a gap of space of approximately 2-3mm. Rust was observed on the bolts of the outer (D) (4). Sealant and smeared paint was observed on the walls and ceiling tiles in the ISO-7 cleanroom.

  5. 5

    Insufficient production/process controls

    You did not have written production and process control procedures to ensure that any deviations from the procedures are justified. Specifically, 2026-0217-1 - CAPA still open with outstanding work not completed and no additional comments of status or when it will be completed. Doc 131 Inventory Management SOP was supposed to be finalized by the end of February. As of this inspection it has not be completed and the CAPA has not been updated with current information. Additionally, the Change Control Program 102 states that changes in operating procedures are not recorded as change controls but instead are listed under change Document Request Policy 111, but this practice is also used for implementation of new procedures. The nature of the change or policy and significance or risk assessment is not included the determination of whether a change control or a document change request is used. This decision between the two processes does not cover criticality or process changes.

  6. 6

    Incomplete component identification procedure

    You did not establish written procedures describing the identification of components. Specifically, your procedure unique document # 132 entitled Materials Acceptance effective Feb 16, 2026, states you will use a unique unit control number to identify all incoming lots of components and if you received several shipments of the same product with the same lot number on the same day each shipment would get its own unique identifier. Your SOP does not address receiving the same product with the same lot number on a different day. During the review of the following batch records they all used (b) (4) lot (b) (4) however you are not able to determine which shipment the lot of (BD) (4) was a part of, nor does it have a unique identifier used in the batch record. (b) (4) used (b) (4) lot (b) (4); (b) (4) used (b) (4) Lot (b) (4); [illegible].

  7. 7

    Insufficient personnel training and qualifications

    You lack personnel with the necessary training and experience to perform their assigned functions. Specifically, The firm has begun to provide basic GMP training, however, the managers acknowledged lack of awareness of GMP documentation, the need for consistent production processes, and to establish in-house evaluations and validations of microbiological, cleaning, and other procedures. No validation studies were performed in-house for cleaning and disinfectant efficacy, environmental monitoring, microbial media incubation conditions, or other relevant procedures with scientific bases to support the reason for the procedures used. Training on standard operating procedures is not documented. A review of the training record for the assistant cyclotron operator to be cross-trained to perform QC testing lacked documentation and evaluative assessment of the understanding of the relevant standard operating procedures. Complete training records for all employees covering common or specific work activities was not available. For example, receipt of materials, record keeping, good documentation, principles of data integrity, preventing chemical or microbial cross contamination, and other practices were lacking.

Ask FDAgent about this Form 483

FDAgent reads the 483, the facility's inspections, warning letters and FDA's citations and answers in plain English, with links to the records.

Edit it or ask as written. 3 questions free, no card needed.

About this data

  • The PDF and its dates come from FDA's Electronic Reading Room, last synced Nov 23, 2026, 04:33 UTC; the inspection, its outcome and FDA's citations from FDA's Data Dashboard.
  • The observations are the text FDAgent read from this PDF by OCR, shown only when every printed observation passed FDAgent’s checks against the scanned text.
  • FDAgent leaves out the names of the people the Form 483 is addressed to and of the investigators.
  • FDAgent is independent of FDA.