Antaria Pty. Ltd.
Units 1 & 2, 81 Shettleston Street, Rocklea, Australia
FEI 3025978151DUNS 891374436
FDA has 2 inspections on file for Antaria Pty. Ltd. in Rocklea, Australia (FEI 3025978151), from 2023 to 2025. The latest ended on and was classified OAI, official action indicated.
OAI means FDA found significant objectionable conditions and recommended regulatory or administrative action. It is the most serious of FDA's three inspection outcomes.
FDA has not published the citations from this inspection, and FDAgent holds no Form 483 that FDA posted for it. FDA posts only some 483s, so this does not show that none was issued. Two of the three FOIA requests for this site have asked FDA for this inspection's 483.
FDA issued a warning letter on (CDER). FDA’s Import Alert 66-40 Red List names this firm at this address. FDA printed no FEI on the entry. No court action or import refusal is filed under this FEI.
As of Nov 21, 2026, the site is registered with FDA as a drug establishment for manufacturing and API manufacturing, through Dec 31, 2026. Its registrant is ADVANCE ZINCTEK LIMITED (D-U-N-S 891374436).
Sources:FDA firm profile ↗Warning letter ↗FDA drug establishment registrations ↗Synced Nov 23, 2026
Ask FDAgent about this site
Email me when FDA posts a new inspection, Form 483 or warning letter for this site
Weekly, on a free account. Pause it any time.
Comparing suppliers? Check this site beside 2 others, free
- Latest inspection
- OAI
- Inspections on file
- 2, 2023–2025
- 2 OAI · 0 VAI · 0 NAI
- Inspections with 483 observations shown
- 1 of 2
- Form 483s posted by FDA
- ↗
- Requested under FOIA
- 3 requests, latest Jul 7, 2026
- Warning letters
- · CDER ↗
- Import refusals
- None under this FEI
- Import alerts
- 66-40Red List
- Matched on FDA’s firm name and street address
- Drug establishment registration
- Through
Inspection history
2 inspections · FDA Data Dashboard, last synced Nov 23, 2026, 04:25 UTC
- OAISignificant objectionable conditions; FDA recommended regulatory actionDrugs · Drug Quality AssuranceCitations not published
- OAISignificant objectionable conditions; FDA recommended regulatory actionDrugs · Drug Quality AssurancePosted 483 · 9 observations
Read this Form 483 on its own page →Form 483 PDF on fda.gov
Read from the FDA-posted Form 483 PDF by OCR. FDAgent keeps an observation only when it matches the scanned text; check the PDF before quoting. The short titles are FDAgent’s.
- Observation 1
Quality unit responsibilities not fully followed
The responsibilities and procedures applicable to the quality control unit are not in writing and fully followed. Specifically, your Quality Unit (QU) failed to fulfill its duties and responsibilities. Examples include the following: a) There is a failure to conduct an appropriate investigation into out of specification (OOS) test results. There is a failure to assess and address all possible root causes for these failures and to identify and implement appropriate corrective actions to prevent their reoccurrence. b) There is a failure of the Quality Unit to review and approve all written procedures. For example, your firm uses some documents, including checklists, to supplement approved procedures that do not show review and approval (signature and date) by QA. Examples include POS206.142_R0 Lab Checklist - Data Processing for HPIC Issue Date: 27FEB2023 POS201.27_R0 Issue Checklist for CoA Generation/ Checklist for CoA Review Issue Date: 14JAN2022 c) Annual product quality reviews are not being performed in a timely manner. As of the date of this inspection, your firm has not completed an annual product quality review for products manufactured in 2022. d) The annual product quality review for products manufactured in 2021 states: "no records were found for products being tested for stability in 2021 for the Brisbane site". The annual product quality review for products manufactured in 2020 states: "no records were found for products being tested for stability in 2020 for the Brisbane site". These reports were approved by QA however, the lack of stability studies and stability data for 2020 and 2021 did not trigger an investigation. e) Your firm is not following SOP 206.113 Brisbane Stability Oven Operation, Rev 0 issued 08AUG2022 regarding (b) (4) downloading and review of the temperature and humidity readings from the data loggers for the stability chambers. The data loggers reached their maximum storage capacity on October 6, 2022 and has not recorded temperature or humidity in the stability chambers since that date.
- Observation 2
Inadequate OOS investigations and root cause analysis
There is a failure to thoroughly review any unexplained discrepancy or the failure of a batch or any of its components to meet any of its specifications, whether or not the batch has been already distributed. Specifically, your firm's Quality Unit failed to adequately investigate Out of Specification (OOS) test results, determine root cause, and implement corrective actions. Approximately 146 OOS results were obtained in 2023 for (b) (4) API for all countries, including for assay and Loss on Ignition (LOI). At the time of testing all lots of (b) (4) API have the potential to be shipped to US and all are labeled as USP grade. There is no documentation of root cause or any specific information regarding investigations to justify attributing the failure to such items as not following SOP, issue with sample amount or sample unity, and/or technician error. Many OOS investigations are simply a re-testing of the product by a different analyst. There is limited to no documentation of the preparation of the initial samples and standards or of the re-tested sample nor is there documented justification for invalidating the initial result except to state the product passed when tested by a different analyst. Sometimes the re-testing is performed by a third analyst as the initial and re-test results are both OOS. Examples of OOS investigations in 2023 that were not adequately investigated for product shipped to the US include the following: Lot (b) (4) OOS 125B) - failed (b) (4) assay at (b) (4) % (specification is (b) (4) - (b) (4) %). The product was re-tested by a second analyst and passed. OOS was attributed to an issue with the SOP not being followed but contains no documentation of what aspect of the SOP was not followed. The product was released by QA on July 13, 2023. Lot (b) (4) (OOS 856) - failed (b) (4) assay at (b) (4) %. The product was re-tested twice by two different analysts as the first re-test was also OOS. The third re-test has passing results and the OOS was attributed to an issue with "sample amount or sample unity". There is no documentation to show issue with sample. The product was released by QA on March 13, 2023. Lot (b) (4) (OOS 18B) - failed Loss on Ignition (LOI) at (b) (4) % (specification is < (b) (4) %). The product was re-tested twice. The first re-test was performed by a different analyst and was also OOS. The third re-test was performed by the original analyst and has passing results. The OOS was attributed to an issue with the SOP not being followed but contains no documentation of what aspect of the SOP was not followed. The product was released by QA on June 8, 2023. Lot (b) (4) (OOS 102B) - failed Loss on Ignition (LOI) at (b) (4) %. The product was re-tested by a second analyst and passed. OOS was attributed to an issue with the SOP not being followed but contains no documentation of what aspect of the SOP was not followed. The product was released by QA on May 26, 2023. Lot (b) (4) (OOS 105B) - failed Loss on Ignition (LOI) at (b) (4) % (one of two values was OOS). The product was re-tested by a second analyst and passed. OOS was attributed to an issue with the SOP not being followed but contains no documentation of what aspect of the SOP was not followed. The product was released by QA on June 14, 2023.
Show observations 3 to 9
- Observation 3
Incomplete laboratory testing documentation records
Laboratory records are deficient in that they do not include a complete record of all data obtained during testing and do not always include documentation of pertinent information related to the preparation and testing of a sample. For example, a) There is no documentation of the preparation of standard stock solutions, working standards, reference standard solutions, sample solutions, diluents, mobile phases, reagents, and other preparations used for performing testing of drug samples including for assay, elemental impurities, and other required USP tests for testing of drug products to include (b) (4) API. b) The "calibration standard" listed in the template for the assay of (b) (4) via (b) (4) chromatography shows a date of preparation as 14FEB23. The bottle of working standard currently being used is dated 12SEP23. Per your technician, the date of 12SEP23 is also incorrect. The technician stated they had prepared the working standard several days earlier but did not change the date on the bottle. c) There is no documentation of the (b) (4) of the sample as required by your test methods. d) Your firm does not document the lot numbers and/or quantity used of reference standards, diluents, reagents and other laboratory consumables used in the preparation and testing of drug products to include (b) (4) USP (API). This includes items used for assay, elemental impurities, and other required USP tests. e) Your firm does not document the instruments and equipment used when performing testing. For example, your firm has (b) (4) different kilns, at least (b) (4) different balances, and various pipettors that can be used during testing.
- Observation 4
No expiration dates for lab reagents standards
Your firm does not assign an expiration date for prepared working standards, mobile phases, diluents and other preparations used for performing testing of drug products, including (b) (4) API. Test methods include testing for assay, elemental impurities, and other required USP tests. For example, the bottle of working standard (b) (4) ug/mL (b) (4) standard solution) that is currently being used for assay by (b) (4) chromatography is marked with a prepared date of 12SEP23 but does not have an expiration date listed. SOP 200.02 Shelf Life of Laboratory Reagents and Samples, rev 03 issued 07JUL2021 defines recommended expiration dates for laboratory prepared reagents and calibration standards however, your firm has no documentation of any validation work to justify these recommended expiration dates.
- Observation 5
No written stability testing program
There is no written testing program designed to assess the stability characteristics of drug products. Specifically, your firm has not placed at least one lot of (b) (4) API (b) (4) on stability annually. For example, you currently have (b) (4) lots on long term stability; (b) (4) lot placed on stability in 2022 and (b) (4) in 2023. No lots have been placed on stability for product manufactured at the Brisbane site in 2019, 2020, or 2021. In addition, your firm uses (b) (4) starting material) from (b) (4) different suppliers however, your firm has not evaluated the need to place lots made from each supplier on stability. The stability study conducted on (b) (4) lots of (b) (4) API manufactured at your Perth facility in 2015 does not have an approved written protocol. Your firm did not define the tests to be performed at each time point. The spreadsheet indicates all release tests however, your firm only tested for Loss on Ignition (LOI) and BET (surface area) at each time point after time point 0. The test results are not signed/approved. In addition, there was an OOS at the 60 month time point for LOI for lot# (b) (4). Your firm did not perform an adequate investigation and provided no documented justification for invalidating the original result. Your firm simply had a second analyst re-test the product and then passed it. Your firm is using this study to justify placing a (b) (4) expiration date on the (b) (4) USP (API).
- Observation 6
QC balances not properly calibrated
Calibration of balances used in the QC Laboratory are not calibrated appropriately. For example, the balances are not calibrated over the operating range and there is a failure to demonstrate that the balance meets the requirements defined for repeatability, accuracy, and linearity.
- Observation 7
Failure to follow approved test methods
Your firm is not always following the approved test method. For example, a) SOP206.15 USP (b) (4) Monograph Test Methods, rev 8 issued 09AUG2023, requires the use of a (b) (4) (b) (4) for the performance of the test for (b) (4) and colour of solution. This is consistent with the USP test method. Your firm is using a (b) (4) b) SOP206.15 USP (b) (4) Monograph Test Methods, rev 8 issued 09AUG2023, requires drying of the (b) (4) and sample at (b) (4) C for a minimum of (b) (4) for Loss on Ignition. Your drying oven has a knob (no digital display) and does not have a mark for (b) (4) C. On November 15, 2023, I observed the technician performing the test setting the drying oven to over (b) (4) C as that is the closest mark to (b) (4) C.
- Observation 8
Stability methods not shown stability-indicating
Your firm has no documentation to show the test methods used for stability testing of (b) (4) USP (API) and other drug products are stability indicating.
- Observation 9
Stability chambers not fully qualified
Your firm has not fully qualified the stability chambers used for long term (30C/65%RH - Oven ID O-0007) and accelerated stability studies. The chambers were installed in April 2022. The Operational Qualification (OQ) report approved on August 15, 2022 by QA contains no information about the actual operation of the chambers including no temperature and humidity readings, no verification documentation that the digital read out of the temperature and humidity is correct, no documentation of the placement of the temperature and humidity probes that feed the digital read out, no temperature mapping of the chambers, and no documentation of any alarms for the chambers. The Performance Qualification (PQ) for the chambers has not been completed. There is no approved protocol and the draft protocol provided does not call for verification or qualification of the chambers when full (or at any specific capacity); only (b) (4) monitoring of temperature and humidity of the empty chamber. Your firm brought storage of stability samples in house when these chambers were installed, and you currently have (b) (4) stability samples for the (b) (4) USP) stored in the long term chamber as well as other samples related to (b) (4) dispersions and (b) (4) being contract tested. Your firm has no temperature or humidity data from October 6, 2022 to present except for a (b) (4) note in a logbook. There are several recent entries noting the temperature and/or humidity was out of specification however, no investigation was initiated.
Requested under FOIA
FDA FOIA logs, last synced Nov 23, 2026, 04:25 UTC
Three requests to FDA under the Freedom of Information Act named this site, most recently on Jul 7, 2026. Each one asked for a Form 483.
Inspection ending Jul 21, 2025OAI
2 requests. In the inspection history above. FDA released records in answer to a request for its Form 483 on Dec 11, 2025. FDAgent holds no copy that FDA posted.
- Jan 19, 2026FDA-FOIA-2026-598Form 483· 1 of 2 sitesRecords released
- Nov 28, 2025FDA-FOIA-2025-13350Form 483Records released
Inspection ending Nov 17, 2023OAI
1 request. In the inspection history above. FDA has posted its Form 483.
- Jul 7, 2026FDA-FOIA-2026-6461Form 483· 1 of 2 sitesRecords released
A request is listed when it names this site’s FEI number or one of its FDA inspection IDs, or, after review, its exact street address. Requester names are left out.
Warning letters and compliance actions
FDA Data Dashboard compliance actions
- Warning letterFormal notice of significant violationsCDER · DrugsLetter on fda.govFDA record
Import alerts
FDA import alert pages, last synced Nov 23, 2026, 04:17 UTC. On a Red List, FDA can detain the firm's listed products without examining them.
- 66-40Red ListDetention Without Physical Examination of Drugs From Firms Which Have Not Met Drug GMPsAlert on fda.gov
Date published 2026-01-08
- FDA’s entry
- Antaria Pty. Ltd. · Units 1 & 2, 81 Shettleston Street, Rocklea, Queensland AUSTRALIA
- FDA’s inspection record for FEI 3025978151
- Antaria Pty. Ltd. · Units 1 & 2, 81 Shettleston Street, Rocklea, Australia
Matched on exact firm name, street address and country. FDA printed no FEI on this entry.
15 products
- 54 - D - --Vitamins/Minerals (Human/Animal); Proteins/Unconv Dietary Supp (Human), Human N/Rx 1 Ingr
- 54 - E - --Vitamins/Minerals (Human/Animal); Proteins/Unconv Dietary Supp (Human), Human N/Rx Comb Ingr
- 54 - F - --Vitamins/Minerals (Human/Animal); Proteins/Unconv Dietary Supp (Human), Hum Rx 1 Ingr
Show 12 more products
- 54 - G - --Vitamins/Minerals (Human/Animal); Proteins/Unconv Dietary Supp (Human), Hum Rx Comb Ingr
- 54 - I - --Vitamins/Minerals (Human/Animal); Proteins/Unconv Dietary Supp (Human), Investigational
- 55 - - - --Pharm Necess & Ctnr For Drug/Bio
- 56 - - - --Antibiotics (Human/Animal)
- 58 - - - --Human and Animal Therapeutic Biologic and Biosimilar Drugs
- 60 - - - --Human and Animal Drugs
- 61 - - - --Human and Animal Drugs
- 62 - - - --Human and Animal Drugs
- 63 - - - --Human and Animal Drugs
- 64 - - - --Human and Animal Drugs
- 65 - - - --Human and Animal Drugs
- 66 - - - --Human and Animal Drugs
FDA drug establishment registration
FDA registration search- Registered operations
- Manufacturing, API manufacturing
- Registration runs through
- Dec 31, 2026
- Registrant
- ADVANCE ZINCTEK LIMITEDD-U-N-S 891374436
From FDA’s Drug Establishments Current Registration Site, as of Nov 21, 2026. A registration says what a site told FDA it does. It is not an inspection result. FDA’s registration search looks firms up by name.
Go further than this page
FDAgent researches FDA’s records and links every answer to its source.
About this data. Every record here is filed under FEI 3025978151 in FDA’s data. FDAgent is independent of FDA, and FDA’s firm profile is the authoritative record.
- Every record on this page is filed under FEI 3025978151. Records filed under another FEI or name, including other sites of the same company, are not shown here.
- FDA posts only some Form 483s. A missing 483 does not mean no observations were issued, and classifications can change after FDA review.
- Recalls are not shown, because FDAgent does not hold them by FEI. Import alerts are shown when FDA printed this FEI beside the firm on the alert, or when a Red List entry’s firm name, street address and country equal an inspection record under this FEI and no other FEI has that name. FDA lists most firms by name and address alone, so a site can be on an import alert without it appearing here.
- “Last synced” is when FDAgent last copied that FDA source. FDA often publishes a record weeks after the inspection or action it describes.
- Observation text comes from OCR of the scanned PDF. FDAgent keeps an observation only when it matches the scanned text, and marks unreadable spans [illegible]. Last synced Nov 23, 2026, 04:30 UTC.
- FDAgent is independent and not affiliated with FDA. Check the FDA firm profile for the authoritative record.