21 CFR 111.123: What quality control operations are required for the master manufacturing record, the batch production record, and manufacturing operations?
FDA's inspection data lists no Form 483 citations of 21 CFR 111.123. 1 warning letter states a violation of it.
Counts: FDA Data Dashboard citations, last synced Nov 23, 2026, 04:25 UTC, and FDA's warning letters, last synced Nov 23, 2026, 04:17 UTC. Regulation text: eCFR. FDAgent is independent of FDA.
- Form 483 citations
- 0
- At 0 inspections
- Facilities cited
- 0
- Distinct FEIs
- Most recent citation
- —
- None
- Warning letters
- 1
- State a violation of it
The regulation
The current text of 21 CFR 111.123 from the Electronic Code of Federal Regulations.
§ 111.123 What quality control operations are required for the master manufacturing record, the batch production record, and manufacturing operations?
(a) Quality control operations for the master manufacturing record, the batch production record, and manufacturing operations must include:
(1) Reviewing and approving all master manufacturing records and all modifications to the master manufacturing records;
(2) Reviewing and approving all batch production-related records;
(3) Reviewing all monitoring required under subpart E;
(4) Conducting any required material review and making any required disposition decision;
(5) Approving or rejecting any reprocessing;
(6) Determining whether all in-process specifications established in accordance with § 111.70(c) are met;
(7) Determining whether each finished batch conforms to product specifications established in accordance with § 111.70(e); and
(8) Approving and releasing, or rejecting, each finished batch for distribution, including any reprocessed finished batch.
(b) Quality control personnel must not approve and release for distribution:
(1) Any batch of dietary supplement for which any component in the batch does not meet its identity specification;
(2) Any batch of dietary supplement, including any reprocessed batch, that does not meet all product specifications established in accordance with § 111.70(e);
(3) Any batch of dietary supplement, including any reprocessed batch, that has not been manufactured, packaged, labeled, and held under conditions to prevent adulteration under section 402(a)(1), (a)(2), (a)(3), and (a)(4) of the act; and
(4) Any product received from a supplier for packaging or labeling as a dietary supplement (and for distribution rather than for return to the supplier) for which sufficient assurance is not provided to adequately identify the product and to determine that the product is consistent with your purchase order.
21 CFR Part 111: Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements, Subpart FRead on eCFR
Warning letters stating a violation of 21 CFR 111.123
1 warning letter FDA posted states a violation of this section in a numbered violation sentence. The most recent are below, each linking to FDAgent's page for the letter.
“Your quality control operations for the MMR, the BPR, and manufacturing operations failed to include approving or rejecting any reprocessing, as required by 21 CFR 111.123(a)(5).”
- Quality Supplement Manufacturing, Inc.Issued 2022-12-13
Ask FDAgent about 21 CFR 111.123
FDAgent reads FDA's Form 483 citations, observations and warning letters and answers in plain English, with links to the records.
Related
About this data
- Citation counts come from FDA's Data Dashboard, which lists the regulation behind each Form 483 observation for inspections since October 2008.
- Observation excerpts come from Form 483 PDFs in FDA's electronic reading room, tied to this section only by exact wording as described above.
- A warning letter counts for this section when one of its numbered violation sentences cites 21 CFR 111.123; FDAgent quotes that sentence exactly.
- FDAgent rebuilds this page every week from FDA's public data and is independent of FDA.